The construction of the new Hammersmith Holiday Inn is well underway.
Elliott Group has built upwards of 2,000 hotel bedrooms in recent years together with a host of leisure centres both public and private.
They have perfected hotel & leisure construction from the design stage through to handover by using practical prefabrication methods insofar as possible so that we can shorten the build time and improve the quality of the finished product. These prefabrication methods are carefully coordinated with services, ensuring life cycle and utility costs are optimised.
Compare Gif showing the changes from July 2019 to September 2019: