The St. Columba’s College Social Hub Project has taken shape, using live view & time-lapse to keep the construction team on track.

With Phase 1 completed, the Hub will be open for the students in the coming academic year.

The two-story block on the lower ground floor, with an entrance, toilets, and boiler house, includes a first-floor server that adjoins the south-facing garden pavilion, providing both casual and formal events with a wide interconnected social room.

Swipe Left and Right to view the construction progress.

Compare imagesCompare images

The design of the works included part of the historic stone garden wall being deconstructed and reinstated. In advance of the job, extensive historical analysis and recoding were conducted and ensured that the reinstatement was in line with the best standards of conservation.

This video was filmed during the visit to the college for the RIAI awards submission for Whispering House.

https://vimeo.com/461830298