Time-lapse construction of one of Irelands largest wind turbines on an existing meat factory in Cavan.

The wind turbine power the factory and sell excess energy back to the grid. Broomfield Construction acted as main contractors and PSCS alongside the turbine assemblers Enercon & consultants Gaeltech in constructing the wind turbine.

Broomfield also managed the roadworks associated with transporting the turbine from Dublin Port to Cavan which included extensive works to roundabouts and turns in Cavan.

Swipe Left and Right to view the construction progress from Sept 2017 to June 2019.

Compare imagesCompare images