Sir Run Run Shaw Charitable Trust appointed Lendlease to develop the new Shaw Tower on their prominent 100 Beach Road city address. With a height of nearly 200m, the integrated building will house 450,000 square feet of Grade A office space, as well as retail and food & beverage offerings on the ground floor.

Other features of the new Shaw Tower include indoor community services, lifestyle amenities, an outdoor amphitheatre, sky gardens and terraces as well as end-of-trip cycling facilities. Under retail offerings, Lendlease is looking to roll out up to four F&B outlets.

According to Lendlease, the multiple sky gardens and terraces complement the Urban Redevelopment Authority’s vision of a green city, with park-like environments integrated into the building design.

Swipe left and right to view the construction progress from May 2021 to February 2022 as displayed by the 1st Camera.

Compare image Shaw Tower Singapore Evercam timelapse screenshot camera 2 May 2021Compare image Shaw Tower Singapore Evercam timelapse screenshot camera 2 Feb 2021

The new Shaw Tower will be designed to meet two leading sustainable building standards: the International Building Institute’s WELL rating and the local BCA Green Mark. The target completion of the development is set for 2024.

Lendlease has installed 2 cameras from Evercam from which the time-lapse videos are used periodically to show the project status to the owner during their meetings.

Swipe left and right to view the construction progress from May 2021 to December 2021 as displayed by the 2nd Camera

Compare image Shaw Tower Singapore Evercam timelapse screenshot May 2021Compare image Compare image Shaw Tower Singapore Evercam timelapse screenshot December 2021