Lloyd Group is an efficient, well-managed, and fully resourced construction company with a consistent track record of delivering high-quality results. The company has been tasked with the construction of the new Learning Hub at St Pius X College.
The new Learning Hub, adjacent to the Chatswood Campus is a major expansion to the College’s footprint and is part of its ongoing commitment to providing a holistic, innovative, and liberating education for its students.
It is a purpose-built, modern, two-level learning space that will provide 8 new classrooms that can be used as flexible indoor and outdoor learning spaces. It will feature covered outdoor learning spaces, staff collegial spaces, a lift, and ramps for disabled access and will be fully integrated into the College IT network. The Hub has been designed to fit in with the existing heritage area of the surrounding residential streets. The building will be environmentally sustainable with solar panels, greywater, natural light, and airflow. The project is estimated to cost approximately $8m and will be ready to welcome students and staff in Term 1 2023.
Swipe Left and Right to view the construction progress from October 2021 to March 2022
Throughout the construction of this project, Evercam cameras are used to track progress of construction, and project management and to capture any health & safety incidents that may occur. The time-lapse videos are used to give investors timely updates each month.